Separate capital and recurring costs
Start with equipment, installation, site utilities and commissioning. Add recurring labor, power, consumables, disposal and downtime. Separate facility-supplied work from the vendor's offer.
Compare the same performance and system boundary
Price particulate removal, other pollutant control stages and required monitoring on the same duties. Check the parts of the treatment train included by each bidder, including supports, ducts and outlet.
Use production and loading data from the actual facility
For example, when evaluating a foundry, request the production profile, dust mass loading or representative measurements by process and peak versus normal operating flow. Determine what must be refurbished and what can be retained before applying pricing assumptions.
Check cost sensitivity before deciding
Compare costs at plausible production, tariff, replacement and downtime assumptions. If the decision changes with one uncertain input, prioritize a measurement or supplier test to resolve it.
Use the estimate in commercial discussions
Request each vendor's cost breakdown and field-test scope. Define the period and basis of the recurring-cost comparison and keep price estimates tied to a date and scope.